In this section, you will make the Isolation Assembly, following the 4 steps below.
This section will take approximately 15 to 60 miniutes, depending on your skill level and equipment.
Tools Needed in this Section
- Paper Towels or other disposable work surface/wipes
- #1 Philips Head Screwdriver
- Flat-Nose Pliers
- Parallax Combination Wrench
- Scissors
Parts Needed in this Section
- 8 - Machine Screw, #4-40 x 3/8”, #1 in drawing below
- 1 - ELEV-8 v3 Flight Controller Cover (#721-80300), #2 in drawing below
- 4 - Nylon Machine Screw, #4-40 x 5/8", #3 in drawing below
- 1 - ELEV-8 Flight Controller (#80204), #4 in drawing below
- 4 - Nylon Spacer, #4 x 3/16", #5 in drawing below
- 1 - ELEV-8 Power Distribution Board (#80361), #6 in drawing below
- 4 - Standoffs, #4-40 x 7/8", #7 in drawing below
- 4 - Nylon Spacer, #4 x 1/8", #8 in drawing below
- 1 - Isolation Plate (#721-80301), #9 in drawing below
- 4 - Nylon Hex Nut, #4-40, #10 in drawing below
- 1 - 3-Wire Servo Extension Cable, 4" (#800-00040), not pictured
- 1 - Foam, Open-Cell Block (#900-00106), not pictured
- 1 – Loctite® Threadlocker Blue 242® (#700-00106), not pictured
A PDF of the above drawing is available for download here.